HOME UPGRADE INITIATIVE · PROJECT WORKSHEET

Tub-to-shower scope record

Keep one record beside each written proposal. Mark what is known, name who resolves the rest, and retain the original estimate with any revisions.

Read the conversion-cost guide

1. Identify the proposal being discussed

Proposal reference / revision date
Contractor / contact
Shower result and room boundary
Selected base, walls and enclosure
Existing connections assumed to remain
Person confirming those assumptions

2. Put the whole installed job in the record

For each row choose: included · excluded · allowance · unresolved. In Evidence, record the proposal page, selected document or written answer. A blank does not mean included or $0.

Part of the jobRecord the agreed boundaryStatus, responsible person and evidence
Removal and protectionOld tub, disposal, route protection and nearby fixturesStatus:
Owner:
Evidence:
Shower base and supportNamed base, preparation and support; conditions to verifyStatus:
Owner:
Evidence:
Wall assemblySelected finish, backing, water management and edgesStatus:
Owner:
Evidence:
ConnectionsDrain, valve and other fittings; what stays or changesStatus:
Owner:
Evidence:
Assembly interfacesBase-to-wall, drain and penetration responsibilityStatus:
Owner:
Evidence:
Entry and enclosureThreshold, glass/door, fittings and installationStatus:
Owner:
Evidence:
Adjacent finishesDisturbed floor, walls, trim, paint and transitionsStatus:
Owner:
Evidence:
Permits and checksApplicable authority response, coordination and feesStatus:
Owner:
Evidence:
CloseoutCleanup, product documents and agreed completed-work checksStatus:
Owner:
Evidence:

3. Separate choices from the agreed price

Written project total / proposal version
Allowances and what they cover
Option deltas accepted / declined
Household reserve, outside contract total

Copy only documented amounts. Do not turn an exclusion or an unresolved condition into a made-up price. Check whether an accepted option is already reflected in the revised total before adding it again.

4. Resolve the open items

Question · person answering · written response/reference · revised proposal/date if needed