HOME UPGRADE INITIATIVE · PROJECT WORKSHEET
Tub-to-shower scope record
Keep one record beside each written proposal. Mark what is known, name who resolves the rest, and retain the original estimate with any revisions.
1. Identify the proposal being discussed
Proposal reference / revision date
Contractor / contact
Shower result and room boundary
Selected base, walls and enclosure
Existing connections assumed to remain
Person confirming those assumptions
2. Put the whole installed job in the record
For each row choose: included · excluded · allowance · unresolved. In Evidence, record the proposal page, selected document or written answer. A blank does not mean included or $0.
| Part of the job | Record the agreed boundary | Status, responsible person and evidence |
|---|---|---|
| Removal and protection | Old tub, disposal, route protection and nearby fixtures | Status: Owner: Evidence: |
| Shower base and support | Named base, preparation and support; conditions to verify | Status: Owner: Evidence: |
| Wall assembly | Selected finish, backing, water management and edges | Status: Owner: Evidence: |
| Connections | Drain, valve and other fittings; what stays or changes | Status: Owner: Evidence: |
| Assembly interfaces | Base-to-wall, drain and penetration responsibility | Status: Owner: Evidence: |
| Entry and enclosure | Threshold, glass/door, fittings and installation | Status: Owner: Evidence: |
| Adjacent finishes | Disturbed floor, walls, trim, paint and transitions | Status: Owner: Evidence: |
| Permits and checks | Applicable authority response, coordination and fees | Status: Owner: Evidence: |
| Closeout | Cleanup, product documents and agreed completed-work checks | Status: Owner: Evidence: |
3. Separate choices from the agreed price
Written project total / proposal version
Allowances and what they cover
Option deltas accepted / declined
Household reserve, outside contract total
Copy only documented amounts. Do not turn an exclusion or an unresolved condition into a made-up price. Check whether an accepted option is already reflected in the revised total before adding it again.
4. Resolve the open items
Question · person answering · written response/reference · revised proposal/date if needed